
Prefabricated Construction
We helped our client create a modular timber frame solution to reduce install time on site.
The office building uses modular floor cassettes and wall systems that enabled the structure to be installed and watertight in 3 days with the majority of the building completed within a week.
The cedar cladding gave the structure a modern and premium feel and looked beautiful within the surrounding landscape.